Home-  Sailboat-  Submarines-  ROVs-  Metal Working-  Other Stuff -  About Us

Build Log
Origami Hull
  Paul's 65ft Origami
  Modeling
  Steel vs Aluminum
  Getting Steel
  Lofting
  Welding
  Cutting Darts
  Folding the Hull
  Bow and Transom
  Decks
  Bulkheads
  Companionways
Propulsion
  Junk Sails
  Background Info
  Diesel Engine
  Controllable Pitch
  Other Propellers
  Diesel/Hybrid/Elec
Pilot House
Canvas Work
Gantry and Hoist
Anchors
Winches
Block & Tackle
Rigging
Keels
Skeg, Rudder & Helm
Deck Crane
Hydraulics
Sand Blasting
Painting
Electrical
Insulation
Refrigeration
Hatches / Portlights
Tender
Launch
Rules of Thumb
Links

 

Build Log - Page 4

 

Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 21 22 23

 

 

 

 

 

 

 

 

 

 

So after bringing the Hundested controllable pitch propeller system 2000 miles home we opened it up and discovered that parts were missing.  Sweet opportunity.

 

"The trouble with opportunity is that it always comes disguised as hard work."

                                                                       -- Anonymous

 

 

 

 


Dec 2011

Cleaning up Hundested controllable pitch propeller system.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Dec 2011

Taking a break from the Hundested, we took advantage of some nice weather to build sand blaster.

For us, a wet sand blaster is the way we will go. No dust, no screening, no drying, no pissed off neighbors, and we can reuse the sand.

 

 

 

 

 

 

 

 

 

 

 

 

New Years Eve 2011

Back inside, we got the propeller blade pattern finished and on New Years Day we got the Hundested tear down completed.

 

 

 

 

 

Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
 23